Data center developers are looking for large pieces of Texas land with power, fiber and room to build. If you own acreage, this guide explains what they look for, how much land a project needs, and what an option, lease or sale can look like, in plain English. It is written by Davis Vernon's Land & Energy Advisory team in Vernon, Texas. Last updated: November 2026.
Own land and want a straight answer? Tell us about your land. Looking for sites? See off-market sites.
Maybe, and it depends on much more than acreage. Developers screen land against the factors below. Power usually decides it: a parcel with a realistic path to power is worth a serious look, and a parcel without one rarely gets far, no matter how big it is.
The deciding factor. Developers look for land close to high-voltage transmission lines and substations, and a utility that can actually serve tens or hundreds of megawatts. A nearby line is not the same as available capacity.
Data centers need high-capacity fiber routes. Land near existing long-haul or metro fiber is far easier to serve than a site that needs miles of new build.
Cooling design drives water demand. Developers check local groundwater rules, municipal supply and whether air-cooled or low-water designs are an option.
Some projects plan on-site generation, so a nearby gas pipeline with spare capacity can add real value.
Large, contiguous, usable acreage matters more than gross acres. A square, flat 300 acres beats a stretched, broken 500.
Floodplain, wetlands, creeks, steep ground and pipeline or power-line easements all subtract from buildable land. The calculator below shows how much.
Developers check county and city rules, road access for heavy trucks, and whether neighbors or local officials are likely to object.
In Texas the minerals are often owned separately from the surface. A severed mineral estate, liens or unclear title can slow or stop a deal.
Expect a Phase I environmental review. Past oil and gas activity, old dumps or storage tanks are common findings on rural land.
Three quick tools for early planning. They run in your browser, store nothing and ask for no contact information. They give rough ranges only. Real needs depend on building design, substation size, cooling, setbacks and the utility.
Enter the planned load in megawatts (MW) to see a rough acreage range.
Worked example: a 100 MW hyperscale project at 1 to 2 acres per MW needs about 100 to 200 acres (0.2 to 0.3 square miles).
| Project type | Acres per MW |
|---|---|
| Edge / small site (up to 10 MW) | 1 to 3 |
| Colocation (10 to 50 MW) | 1 to 2 |
| Hyperscale (50 to 300 MW) | 1 to 2 |
| AI / gigawatt-scale campus (300 MW and up) | 1 to 2 |
Gross acres are not buildable acres. Enter the acres lost to each constraint. If some acres fall in more than one (for example a setback inside a floodplain), enter them under overlap so they are not subtracted twice.
Worked example: a 500 acre parcel with 40 acres of floodplain, 20 of wetlands, 30 of steep ground, 15 of easements and 60 of setbacks, less 25 acres of overlap, leaves about 360 buildable acres (72%). At the hyperscale range that could support roughly 180 to 360 MW. This does not check whether the buildable land is in one connected piece, which matters a lot.
Options pay a yearly fee for the right to buy your land later. Enter the terms you have been offered, or try some, to see the totals. Fees are assumed to be non-refundable.
Worked example: 300 acres at $30,000 per acre ($9,000,000), a $500 per acre yearly fee, a 2 year initial term and two 1 year extensions with a 10% fee increase each time. If the buyer walks after the initial term you keep $300,000. If they use every extension and then walk you keep $646,500. If they close after the last extension with fees credited, you receive $9,000,000 in total.
These calculators are for early planning only. They are not an appraisal, engineering study, offer, or legal, tax or financial advice. Talk to us about your actual land.
These are the issues that most often kill or delay a data center deal on rural land. Knowing them early saves time:
Data centers are a debated subject in Texas, and reasonable landowners come down in different places. Before you decide, think about the points below. This is not a case for or against data centers. It is a list of what an owner should understand first.
Cooling design drives how much water a facility uses. Some designs use little water but more electricity. Ask where the water would come from, how much is needed, and what it could mean for your own wells and your neighbors'. Groundwater rules vary by local district.
A large new load affects utility planning. Ask who pays for new lines and substations, and how the project could affect other customers. Rules in Texas are still changing, so get the current picture from the developer and the utility.
Cooling equipment and backup generators can be loud, and construction brings heavy truck traffic. Ask about setbacks, noise limits and buffers between the facility and your remaining land and neighbors.
Local reaction can make or break a project. Talk with neighbors and county officials early. Opposition can delay or end a deal, and it can affect relationships long after it is over.
Projects may seek local tax abatements, which is often debated. Changing how land is used can also affect its agricultural valuation, and back taxes may apply. Ask a tax professional before you sign.
Construction creates temporary jobs, while permanent staffing is usually small compared with the size of the project. Land can be committed for decades, so look closely at term, restoration and decommissioning terms.
Farming or ranching use, open land, access and sometimes minerals or other rights. Think about what is left of the rest of your property and how it will be used and reached.
Many landowners decide a data center is not right for them, and some keep the land or sell to a farmer or rancher instead. Nothing obliges you to say yes to an offer, and a good advisor will tell you when a deal does not fit your goals.
Most data center land deals take one of three forms:
What it is: A buyer pays you a yearly fee for the exclusive right to buy your land at an agreed price while they study power, permits and design.
Keep in mind: You keep the land and keep the fees even if the buyer walks away. Check whether fees are credited toward the price and what happens if the buyer asks for extensions.
What it is: You keep ownership and are paid rent, usually per acre per year, often with scheduled increases.
Keep in mind: Steady income and you keep the land, but your use of it is limited for decades. Pay close attention to term, restoration and who owns the improvements.
What it is: You sell the land at a negotiated price, often after an option period.
Keep in mind: A clean exit and a known price. Consider the tax effect and whether you want to keep the minerals or other rights.
Always have an attorney and tax advisor review any agreement. Our Land & Energy Guide covers leases, easements and evaluating offers in more detail.
Davis Vernon has sold Texas ranches and farmland since our founding, and our Land & Energy Advisory practice applies that land knowledge to energy and data center projects.
Not every site is publicly listed. We work with landowners on off-market land, including parcels that look like strong candidates for data center and other large-load projects.
If you are a developer or land buyer looking for sites, tell us what you need: the load in megawatts, an acreage range, the region or utility, the timeline and any must-haves such as fiber, gas or water. We will tell you whether we have a match.
Possibly, but it depends on far more than acreage. The biggest factor is power: how close the land is to high-voltage lines and substations and whether the utility can serve a large load. Fiber, water, size and shape, flood and terrain, zoning, minerals and title all matter too. The checklist above shows what developers look at.
No. Transmission lines carry a limited amount of power, and a data center may need tens or hundreds of megawatts. The utility and the grid operator have to confirm capacity and approve the connection, and large-load requests can take years. Always confirm capacity with the utility before assuming a site has power.
It depends on the size of the power load. As a rough planning range, about 1 to 3 acres per megawatt for small sites and 1 to 2 acres per megawatt for larger campuses, including buffers and an on-site substation. A 100 megawatt project might need 100 to 200 acres. Use the calculator above for your numbers.
Land that has confirmed utility power capacity, or a credible studied path to it. Developers often pay more for powered land because power is usually the longest and hardest part of a project.
There is no standard number. Value depends on power availability, location, size, shape, fiber, water, zoning and deal structure. Land with a real power path can be worth more than the same land in farm or ranch use, but that is never guaranteed. A broker opinion and a full read of any offer is the best way to find out.
It depends on your goals, your land and the terms. Data centers are debated in Texas, with concerns about water, power, noise, taxes and local impact on one side and landowner income and demand for land on the other. Understand the downsides as well as the offer, talk to your neighbors and professionals, and know that saying no is a legitimate choice.
Each fits a different goal. An option pays you to hold the land while the buyer studies it, a lease keeps ownership with you and pays rent, and a sale is a clean exit. Have an attorney and a tax advisor review any agreement before you sign.
In some options, the yearly option fees you receive are subtracted from the purchase price at closing, so the total you receive does not exceed the price. In others the fees are on top of the price. The option payment calculator above shows both.
In Texas the mineral estate is often owned separately from the surface, so a surface use agreement or other arrangement may be needed. Groundwater is generally regulated locally by groundwater conservation districts. Both can affect a data center site, so find out what you own and what is severed before you talk price.
Be cautious about signing anything quickly, especially non-disclosure agreements, exclusivity or option agreements. Ask who the end user is and what the real terms are, and have an attorney review them. Our team can help you evaluate the offer.
Often many months and sometimes years. Securing power usually takes the longest, which is why options with extension periods are common.
We help you understand whether your land looks like a candidate, explain your options, and where it fits connect the site with developers and buyers or help you evaluate an offer. We also work with off-market sites. Start with a conversation, with no obligation.
Send us the county, rough acreage and anything you know about nearby power lines or substations. We'll tell you plainly whether it looks like a candidate and what would need to be true for it to work. No obligation.